How to replace the O-rings in the brown and black tube connectors

This video shows how to replace the O-rings in the brown and black tube connectors.

If there is leakage from the brown or black tube, the O-ring may be deformed or damaged. In that case, the O-ring needs to be replaced to stop the leak.

Note that when this happens, the insulation plates can eventually become soaked. This may short the GHC board and cause ghost-tap issues. Consequently, we need to check the condition of the GHC board and replace it if it's permanently damaged.

This video is part of a series that we produce, helping our users self-repair their Decent Espresso Machine.

  • Only do this repair in consultation with Decent tech support
  • Doing otherwise might break your machine or void your warranty.


  • Chapters

    1. 00:05 Tools
    2. 00:09 Power Disconnection
    3. 00:29 Remove External Components
    4. 01:11 Remove the Main Cover
    5. 01:33 Remove the Chassis
    6. 02:02 Turn the machine upside down
    7. 02:32 Remove the 5 screws on the group head support
    8. 02:58 Turn the machine back into its upright position
    9. 03:13 Lift the group head cover and insulation plate
    10. 03:31 Pull out the clips securing the brown tube
    11. 03:43 Remove the tube from the manifold and the group head
    12. 03:52 Remove the O-ring from the group head side
    13. 04:08 Mount a new O-ring on the tube on the group head side
    14. 04:16 Re-insert the brown tube into the group head
    15. 04:48 Re-insert the clip into the brown tube
    16. 04:53 Remove the O-ring remaining inside the tube connector on the manifold
    17. 04:59 Place a new O-ring and insert it into the connector on the manifold side
    18. 05:09 Re-install the clip on the manifold side
    19. 05:19 Follow the same process for the black tube
    20. 06:11 Organize the insulation plates and cables
    21. 06:24 Close the group head
    22. 06:36 Re-install the side chassis
    23. 07:00 Place a cloth and flip the machine upside down
    24. 07:14 Re-insert and secure the group head screws
    25. 07:41 Contact us with questions


    Instructions on how to replace the O-rings in the brown and black tube connectors


    Tools Needed

  • T10 Torx screwdriver
  • PH2 Phillips Head Screwdriver
  • Angled pointy-tip tweezers
  • Cloth


  • Step 1: Power Disconnection

    For DE1XL or DE1XXL Models:
    1. Remove the back panel.
    2. Turn off the machine's back switch.
    3. Unplug the power cord.

    For DE1PRO and DE1PLUS Models:
    1. Turn off the machine's back switch.
    2. Unplug the power cord.


    Step 2: Remove External Components

    For v1.43 or Higher (Slide-in Tablet Stand):
    1. Unplug the USB cable.
    2. Gently pull the tablet stand out.

    For v1.3 to v1.42 (Screwed-in Tablet Stand):
    1. Unscrew the 3 screws holding the tablet stand.
    2. Remove the stand.

    Then...

    1. Remove the drip tray.
    2. Remove the drip tray cover.
    3. Lift the lever on the back of the machine.
    4. Slide the water tank out and remove it.
    5. Remove the portafilter.
    6. Remove the group head handle.


    Step 3: Remove the Main Cover

    1. Use a T10 screwdriver to remove the 8 screws securing the main cover.
    2. Gently stretch the sides of the cover outward.
    3. Lift the cover off the machine.


    Step 4: Remove the Chassis

    1. Identify the screw type for the manifold (T10 Torx or PH2 Phillips).
    2. Remove the 6 screws securing the chassis.
    3. Remove the side screw of the boardroom lid (T10 or PH2).
    4. Remove the lid


    Step 5: Open the Group Head Cover

    1. Place a soft cloth on the table.
    2. Rotate the steam wand to a horizontal position.
    3. Flip the machine upside down and place it gently on the cloth.
    4. Use a T10 Torx screwdriver to remove the 5 screws located under the group head.
    5. Use angled tweezers to pull the screws out after loosening them.
    6. Flip the machine back to its upright position.
    7. Lift the group head cover straight off.
    8. Lift the bottom insulation plate to access the interior components.


    Step 6: Remove the brown tube and O-rings

    1. Use angled tweezers to pull out the clips securing the brown tube on both the manifold and the group head.
    2. Remove the brown tube from both the manifold and the group head.
    3. Insert the angled tweezers into the group head connector.
    4. Remove the O-ring by either stretching it from the center or prying it out.


    Step 7: Install a new O-ring and the brown tube

    1. Place a new O-ring onto the tube end on the group head side.
    2. Insert the tube into the group head connector, keeping it straight.
    3. Gently push with a circular motion until the brass end is no longer visible.
    4. If it doesn't go in smoothly, the O-ring may be tilted—remove and try again.
    5. Once fully seated, reinstall the clip to secure it.


    Step 8: Replace the O-ring in the manifold connector

    1. Remove the remaining O-ring inside the manifold connector using a T10 Torx screwdriver.
    2. Place a new O-ring on the tube end and insert it into the connector with a gentle circular motion.
    3. Reinstall the clip once fully inserted.


    Step 9: Replace O-rings on the black tube

    1. Remove the clip from the black tube connector on the group head using angled tweezers.
    2. Insert the tweezers into the connector and remove the O-ring by stretching or prying.
    3. Place a new O-ring on the tube end and insert it straight into the connector with a gentle circular motion until the brass end disappears.
    4. If insertion is difficult, the O-ring may be tilted—remove and retry.
    5. Reinstall the clip once fully inserted.


    Step 10: Close the Group Head

    1. Tidy up the insulation plates and ensure all cables are properly positioned.
    2. Ensure the ground cable is not pinched between any metal parts.
    3. Slightly tilt the group head back.
    4. Insert the rear tab of the chassis into the group head opening.
    5. Gently close the group head.


    Step 11: Install the Side Chassis

    1. Install the side chassis.
    2. Secure it using all six T10 or PH2 screws.


    Step 12: Secure the Bottom Screws

    1. Place a cloth on the table.
    2. Use a thick enough cloth to support the group head evenly. If necessary, fold the cloth to increase its thickness.
    3. Flip the machine upside down again.
    4. Insert all 5 bottom screws.
    5. Start with the top left or right screw for initial alignment.
    6. Adjust the group head angle as needed for proper alignment.
    7. Screw in the first 4 screws only halfway.
    8. Fully tighten all 5 screws once they are aligned.


    Step 13: Final Check

    1. The repair and reassembly are complete.
    2. If you have any questions or issues, please contact our support team.

    #repair #howto #DIY #documentation



  • German: So ersetzen Sie die Dichtungsringe in den braunen und schwarzen Schlauchanschlüssen
  • French: Comment remplacer les joints toriques des connecteurs des tubes marron et noir
  • Spanish: Cómo reemplazar las juntas tóricas de los conectores de tubos marrones y negros
  • Arabic: كيفية استبدال الحلقات الدائرية (O-rings) في الموصلات الأنبوبية البنية والسوداء

    john created 2025/12/15, mirjam updated 2026/03/25